Picture depicts one of the constructed
wetland cells with treatment plant in background
|
PROJECT: FRANCES KELSEY
SECONDARY SCHOOL ADVANCED WASTEWATER TREATMENT
CONSTRUCTED WETLAND AND EFFLUENT IRRIGATION |
| LOCATION: Mill Bay, B.C. |
| OWNER: School District
No. 65 |
| DESCRIPTION: Site constraints
necessitated a 75.6 m3/d treatment and disposal system to serve
1,200 students. The system includes septic tank, equalization
tanks, advanced activated sludge treatment plant with nitrogen
and phosphorous removal, constructed wetland, storage tank, chlorination,
and dechlorination. In summer, the effluent is spray irrigated.
In winter it is discharged to infiltration bed and collected
by a subsurface interceptor for discharge to a storm sewer. System
operation is monitored by PLC. |
| ROLE: Prime consultant,
pre-design, discharge permit negotiations, detail design, construction
supervision, commissioning & start-up assistance. |