Picture depicts one of the constructed wetland
cells.
PROJECT: JOURNEY MIDDLE
SCHOOL SEWAGE TREATMENT & DISPOSAL THROUGH CONSTRUCTED WETLAND
AND INFILTRATION BED
LOCATION: Sooke, B.C.
OWNER: School District
No. 62 (Sooke)
DESCRIPTION: This is an
ecologically sensitive site. The 55 m3/d treatment plant consists
of a septic tank, equalization, a multi-cell extended aeration
activated sludge process, secondary clarifier, effluent subsurface
flow wetland and infiltration bed. The renovated water is collected
by a subsurface interceptor trench and discharged to a storm
sewer. Works included creek diversion around the site.
ROLE: Prime consultant,
pre- and detail design, cost estimating, discharge permit negotiations,
construction supervision and commissioning.