| PROJECT: FISH PROCESSING PLANT AND FISHMEAL
REDUCTION PLANT WASTEWATER COLLECTION, TREATMENT AND DISPOSAL |
| LOCATION: Steveston, B.C. |
| OWNER: B.C. Packers Limited |
| DESCRIPTION: A multi-year project involving
flow measurement, wastestream characterization including unloading
operations, pilot scale treatability tests using chemically assisted
dissolved air floatation unit as well as induced air floatation
unit, in-house waste reduction measures, upgrading of collection
system, evaluation of treatment options, and extension of marine
outfall at the largest fish processing plant in British Columbia.
Also included, annual monitoring of the receiving water and preparation
of a spill response manual. |
| ROLE: Prime consultant, cost estimating,
detail design. |